First Layer sprays peelable protection on finished surfaces before the work starts, checks it during the job and peels it off in one sheet at turnover. We apply it after hours, so the building, the crew or the production never waits. Five packages cover the jobs we take. Every package is temporary surface protection, removed at turnover.
Pick a package. See what you get.
Hover or tap a package. The middle shows what is included. The right shows why it beats traditional protection.
/filters:strip_exif()/filters:no_upscale()/media/bdc36b66-c211-4a2e-9e25-ae19574dfd86.jpeg)
Annual Protection Plan
For building owners and property managers who want one crew on call for tenant work and deliveries. A standby crew for your building, the dock to elevator route, cab protection, lobby and suite entrance protection, and a photo log after every job.
A set number of protection calls per year at a fixed rate.
See the Annual Protection Plan in NYC- One crew and one standard for every tenant job, instead of whatever board each contractor lays down.
- Sprayed protection is sealed. Board and paper can shift, open at the seams and let water and dust underneath.
- A photo log after every visit shows the building what condition the surfaces are in.
- Applied after hours, so the building never waits.
/filters:strip_exif()/filters:no_upscale()/media/c4c3cea5-220f-48b1-9a71-145d86a73a92.jpeg)
Elevator Cab Package
For elevator contractors who need new or refurbished cabs to reach turnover clean. Walls, doors and floor protected from install to turnover, with removal and clean-up at handover. Sills and door tracks can be coated too, and buttons get a clear coat. We plan access and moving parts with the elevator contractor.
Priced per cab.
See the Elevator Cab Package- Buttons, operating panels, stainless and doors get Peeltex Clear, sprayed to the surface with no seams to open (Clear is interior only). Cab walls and floors get Peeltex Grey or White.
- Heavy impact routes get the Premium Assembly: felt backed board, with Peeltex Grey on the hard plastic top, run 6 inches up the wall.
- Peeltex alone has no impact rating, so we pair it with board where tools and loads are expected.
- Peels off in one sheet at turnover.
/filters:strip_exif()/filters:no_upscale()/media/e6e7a651-f0b9-4d9e-9ea6-d263828c3f8a.jpeg)
Lobby and Stone Package
For building owners and restoration firms with a marble, terrazzo or stone lobby floor to get through construction. The protection itself, inspections while the work runs, and removal in one sheet at turnover.
Priced by the job. Polished marble and polished stone are approved for protection. Historic or landmark finishes get a test patch if the conservator asks for one.
See the Lobby and Stone Package- Board and film can let water and dust get underneath and hold moisture against the stone. Sealed protection contains spills on top.
- Peeltex Grey is touch dry in about 2 hours in optimal conditions, so work can go on after the overnight install.
- We test a patch on a new surface.
- Inspected while the work runs, then peeled off in one sheet.
/filters:strip_exif()/filters:no_upscale()/media/410dd777-7faa-4f12-b0d9-39d003669251.jpeg)
Stage Floor Package
For studios and theaters that need a finished floor to survive load in, the run and strike. The floor is protected before the production arrives, touched up while it runs, and peeled off at wrap.
Priced per production.
See the Stage Floor Package for film, TV and theater- Hardboard can shift under load in and lets water and dust get underneath. Sealed protection has no seams.
- Peeltex Grey or White, sprayed after hours so the production never waits.
- Touched up during the run instead of re-laying sheets.
- Peeled off in one sheet at wrap.
/filters:strip_exif()/filters:no_upscale()/media/126aa820-63e5-42bd-a234-a3edb7919177.jpeg)
Facade Glass Package
For glazing contractors and curtain wall crews who need new glass kept clean until handover. Peeltex High Humidity is applied after the glass is installed, protects it outdoors for about 12 months, and is removed at handover.
Priced per job, or per square foot of glass.
See the Facade Glass Package- Sprayed on, not taped or boarded, so there are no seams or edges to lift.
- Peeltex High Humidity is the exterior grade, about 12 months. Clear is interior only, which is why glass gets High Humidity.
- Applied after install, removed at handover.
- Interior glass and mirrors get Peeltex Clear, interior only.
What every quote includes
- 01 Material
- 02 Labor
- 03 Inspection visits
- 04 Touch-up and repair
- 05 Photo log
- 06 Removal
Every quote is fixed after a site walk, because we will not put a number on a surface we have not seen.
Pick by situation
| Your situation | The package |
|---|---|
| A tenant is renovating and trucks will cross your lobby. | Annual Protection Plan |
| New or refurbished elevator cabs are going in. | Elevator Cab Package |
| A marble or terrazzo lobby floor has to last through construction. | Lobby and Stone Package |
| A historic or landmark finish sits next to the work. | Lobby and Stone PackageTest patch if the conservator asks. |
| A film shoot or theater load in is coming to a finished stage floor. | Stage Floor Package |
| New curtain wall glass is waiting on the next trade. | Facade Glass Package |
| A co-op or condo unit is being renovated. | Co-op and condo renovation packageA flat package per unit renovation. Protects lobbies, halls, elevators and doors. |
Where it doesn't go
Peelable protection is not for every surface, and none of these packages pretend otherwise. A few examples:
- Carpet, unless carpet protection goes down first
- Fabrics
- Bare brick, untreated wood and other porous surfaces
- Freshly painted surfaces
- Surfaces in bad shape, such as flaking paint
Five ways to buy
- Per job: quoted by square foot, linear foot or opening.
- Per unit renovation: a flat package for co-op and condo buildings. It protects lobbies, halls, elevators and doors during unit renovations.
- Annual plan: a set number of protection calls per year at a fixed rate.
- Product only: Peeltex through Strata Shield Supply, with crew training.
- Rental: reusable door guards, corner guards and stair covers, installed and collected.
Tell us the building. We will tell you the package.
We walk the site, name the package that fits and write the quote from what we saw.