Facade Protection for Painting Contractors in NY
First Layer sprays temporary surface protection on glass, frames and metal before facade, masonry and paint work, then peels it off at handover.
For facade, masonry and painting contractors in New York and the Northeast.
Glass, frames and metal while the facade work goes on
Facade, masonry and painting crews work close to glass and finished metal. First Layer sprays temporary surface protection on that glass, those frames and that metal, then peels it off at handover.
This page is for facade, masonry and painting contractors. For the glazing trade itself, see facade glass protection. For masonry led jobs with a conservator involved, see historic restoration protection.
Four places on the outside of a building
New windows
Glass and frames covered after install, so they stay clean through washing, repointing and painting.
Curtain wall
Glass and framing on the elevations that other trades still work around.
Storefront frames
Street level frames and glass, covered from install to handover.
Metal
Finished metal, railings, canopies and panels near the work. See fabricated parts protection.
Spray-applied protection, built for exterior work
The lead service for facade and paint crews is spray-applied protection. For the outside of a building that means Peeltex High Humidity, the exterior grade, which is good for about 12 months outdoors. It goes on windows, curtain wall, storefront frames and metal.
Removal timing is written into every job, so film is not left on past its rated life.
Other services that go with it
Built protection
Dust and separation walls, boxes, corner guards, door and frame guards, and storefront barricades.
Protection upkeep
A weekly or per-visit walk to inspect, repair and re-apply damaged protection.
Condition and damage records
Dated before, during and after photo logs by area and trade, for backcharge evidence.
One crew, one point of contact
Every job follows the same five steps. The same crew that sprays also inspects, repairs and removes.
-
Site walk
We walk the job with your point of contact and agree what gets protected, where and until when.
-
Test patch on a new surface
Before full application, we run a test patch on any surface we have not coated before.
-
Install
One crew sprays and builds the protection to the plan from the walk.
-
Inspect and log
We inspect the protection, repair what needs it and keep dated photo records by area.
-
Peel and hand over
We peel the protection, remove any board, clean and leave the space punch-ready on the scheduled date.
Know what it goes on, and what it does not
Each surface has its own rule. These matter most on facade and paint jobs.
Test first
- Test against the masonry cleaner or acid you plan to use, before full application.
- Test on historic glass, low-E coatings and powder coated finishes first.
What goes where
- Exterior glass and frames take Peeltex High Humidity, about 12 months outside.
- Concrete and precast take High Humidity after a moisture test.
- Interior glass and mirrors take Peeltex Clear. Clear is interior only.
Bare brick is not coated directly, and neither are untreated wood and other porous surfaces. We use board, film or mats there instead. Heat sources are handled the same way, and there is no published heat rating for the film. See where it does not go for the full list.
Quoted from what we see on site
Most facade and paint work is quoted per job, by square foot, linear foot or opening. An annual plan, with a set number of protection calls per year at a fixed rate, suits crews who work on many buildings.
Every quote asks for a site walk first.
Pick the way that fits your schedule
Per job
Quoted by square foot, linear foot or opening.
Annual plan
A set number of protection calls per year at a fixed rate.
Rental
Reusable door guards, corner guards and stair covers, installed and collected.
Facade and paint protection, answered
What does First Layer protect on a facade job?
Glass, frames and metal during facade, masonry and paint work. That includes new windows, curtain wall, storefront frames and finished metal.
How long does the exterior protection stay on?
Peeltex High Humidity is the exterior grade, good for about 12 months outdoors. Removal timing is written into every job so the film is not left on past its rated life. See how a job works.
Do you test before coating?
Yes. We test against the masonry cleaner or acid your crew plans to use, and on historic glass, low-E coatings and powder coated finishes, before full application.
Walk the facade with us before the first coat
Tell us which trades follow yours and what cleaner or acid goes on the masonry. We set the tests and quote the job.