Fabricated Parts Protection in NY
First Layer sprays temporary surface protection on finished steel, panels and parts, so the finish you paid for arrives and installs clean. In the shop, in the yard and on the truck.
- In the shop
- In the yard
- On the truck
/filters:strip_exif()/filters:no_upscale()/media/bdc36b66-c211-4a2e-9e25-ae19574dfd86.jpeg)
How do you protect fabricated parts after they are finished?
Finished metal gets scratched, scuffed and marked long after the fabricator is done with it. It sits in the shop, waits in the yard, rides on a truck and gets handled on site. Fabricated parts protection is a peelable coating on the finished surface that stays on through all of it and peels off when the part is installed.
First Layer sprays a water based peelable film. We use Peeltex Clear indoors on stainless and finished panels, and Peeltex High Humidity for steel and parts stored or moved outdoors. The right one depends on where the part spends its time, so we choose it at the site walk. Quotes are by the job and cover material, labor, mobilization and a minimum job charge.
In the shop
Stainless, anodized metal and finished panels while they are fabricated, handled and stored indoors, before they ship.
ProductPeeltex Clear, interior only
In the yard
Finished steel, equipment and parts that wait in outdoor storage. The coating is exterior grade and runs about 12 months outdoors.
ProductPeeltex High Humidity, exterior
On the truck
Coated finishes protected for transport, so parts reach the site as they left the yard. Count transit time inside the service life.
ProductPeeltex High Humidity, exterior
Architectural metal that goes in on a building facade has its own page: see facade glass and frame protection.
Spray it in your shop. We handle the field.
For glazing, curtain wall, steel and precast fabricators: your shop applies the protection, and First Layer covers the work that happens after the product leaves. Peeltex is supplied to trades and fabricators through Strata Shield Supply, with crew training. We handle field touch-up and removal.
In your shop
Your crew sprays the product. Peeltex comes through Strata Shield Supply, with crew training.
In the field
We handle field touch-up and removal, so product protected in the shop stays protected through to turnover.
Who it is for
Glazing, curtain wall and steel fabricators, and precast concrete manufacturers. Product from shop to turnover.
Protect finished precast from the yard to the building
Finished precast faces, cast-in windows and embedded metal can be protected in the yard, on the truck and on the building. We supply Peeltex High Humidity through Strata Shield Supply, and we handle field touch-up and removal.
Peeltex High Humidity can be used on concrete, including precast. Run a moisture test on the concrete first.
In the yard
Finished faces, cast-in windows and embedded metal protected while they wait.
On the truck
Protection that rides with the load, so panels reach the site as they left the yard.
On the building
Field touch-up after setting, and removal when the work is done.
What to check before we coat
We would rather tell you now than find out on your part. Every new surface gets a test first. For the full list, read where peelable coating does not go.
- Bare brick, untreated wood and other porous surfaces are not coated directly. Concrete and precast take Peeltex High Humidity after a moisture test.
- Test against the masonry cleaner or acid you plan to use before full application.
- Test on powder coated finishes first.
- Remove it within the confirmed service life. Exposure past that can make peeling harder.
- Peeltex Clear is interior only. For the yard or the truck, it is High Humidity.
- Loading docks, dock plates and steel plates can take Peeltex Grey with fine grit. Avoid tight forklift turns, which can tear the film. Tears are easy to repair by re-coating. Peeltex has no published heat rating.
Booth coating is a product sale
Peeltex White for paint booths and overspray areas is supplied by Strata Shield Supply. Call to order.
Fabricated parts protection, answered
Which product goes on steel stored outside?
Peeltex High Humidity, the exterior version. First Layer sprays it on finished steel, equipment and parts that wait in outdoor storage or ride on a truck. It is good for about 12 months outdoors. Peeltex Clear is interior only, so it stays on indoor work. We pick the product at the site walk.
Can you protect stainless and finished panels in the shop?
Yes. Peeltex Clear sprays on milky and dries clear, so you and your inspector can see the finish underneath. We use it indoors on stainless, anodized metal and finished panels during fabrication, storage and shipping indoors. Run a test on specialty coatings and soft finishes before full application.
How long can the coating stay on parts in the yard?
High Humidity is exterior grade and runs about 12 months. Remove it within the confirmed service life for your project, because exposure past that can make peeling harder. Count the time in the yard and on the truck together. We set the removal plan at the site walk, before the first coat goes on.
What should I test first on my parts?
Test on powder coated finishes first, and test against the masonry cleaner or acid you plan to use on the jobsite. Both tests come before full application, so a problem shows up on a sample and not on a finished part. Bare brick, untreated wood and other porous surfaces are not coated directly. Concrete and precast can take Peeltex High Humidity after a moisture test.
A wear indicator for robot routes
Warehouse robots drive the same route all day, and over time they wear a track into the floor and its epoxy finish. We suggest coating that track so the coating wears first and warns you.
- Coat the route in a colored layer, such as green. When the color starts to fade, it is time to recoat before the floor wears.
- Where the route has a QR code for the robots to read, the code goes on first and a clear coat goes over it for protection.
- It shows maintenance needs early, which means fewer surprises and less downtime.
- This is a proposal for new work. Ask us to walk your floor first.
Walk the shop and the yard with us
Tell us what you make, where it waits and how it ships. We choose the product, set the tests and quote the job.