Annual Protection Plan for NYC Buildings
One crew for your building. We protect the dock to elevator route, the cabs, the lobby and the suite entrances during tenant jobs and deliveries, with temporary surface protection.
We install, inspect during the job and peel off at turnover.
Five stops from the dock to the suite door
Every tenant job and delivery travels the same path. We protect each stop with the right material, and we tell you plainly what gets different handling.
Cab protection has its own page, and so does stone.
-
Loading dock
What we usePeeltex Grey with fine grit on the dock floor and steel dock plates, with mats and impact board where carts and pallets roll. We broadcast fine sand or glass dust into the wet coat about 1 hour after coating, for traction and slip resistance.
Watch forAvoid tight forklift turns, which can tear the film. Tears are easy to repair by re-coating. We flag that risk at the walk.
-
Service corridor
What we useFelt backed impact board with Peeltex Grey on the hard plastic top, run 6 inches up the wall.
Handled differentlyCarpet is not coated directly. Koruser or Axiom carpet protection goes down first, then Peeltex over it. Fabrics and fresh paint get board or mats.
-
Freight elevator
What we usePeeltex Grey or White on the cab walls, floors, sills and door tracks, and Peeltex Clear on buttons and operating panels. Impact board with a sealed top on the cab floor, felt side down, with nothing sprayed between board and floor.
We plan with the contractorWe plan access and moving parts with the elevator contractor before any work starts.
-
Lobby
What we usePeeltex Grey or Clear on polished marble, terrazzo and polished stone, which are approved for Peeltex.
Historic finishesHistoric or landmark finishes still get a test patch if the conservator asks for one.
-
Suite entrance
What we usePeeltex Grey on the finished hard floor up to the suite door, with board where carts or tools will pass. For traction, we broadcast fine sand or glass dust into the wet coat about 1 hour after coating.
Handled differentlyCarpet is not coated directly. Koruser or Axiom carpet protection goes down first, then Peeltex over it. Fabrics get mats or film.
What you get
One crew for the building, so protection is a phone call and not a vendor search.
- A set number of protection calls per year at a fixed rate
- Protection along the whole route, dock to suite entrance
- Inspection, repair and re-application while the work runs
- Peel, clean and removal when the job ends
- Dated before, during and after photo logs by area
Ways to buy
Annual protection plan
For property and facilities managers: a set number of protection calls per year at a fixed rate.
Co-op and condo renovation package
A flat package per unit renovation. It protects lobbies, halls, elevators and doors while the unit is renovated.
Per job
Quoted by square foot, linear foot or opening.
Priced by the job. Request a quote or book a site walk.
Your contractor rules, one call
Many buildings already write protection into their contractor rules. Then every job brings its own crew, its own material and its own cleanup.
We become the one crew. Your tenants' contractors call us, or you do, and the route is protected before their work starts.
Questions from owners and managers
What is the annual protection plan?
It is a set number of protection calls per year at a fixed rate, for property and facilities managers. When a tenant job or delivery needs protection, one crew covers the dock to elevator route, the cab, the lobby and the suite entrance with temporary surface protection.
What is the co-op and condo renovation package?
It is a flat package for each unit renovation. It protects the lobby, halls, elevators and doors while the renovation runs. Everything is priced by the job: request a quote or book a site walk.
What does the crew not coat directly?
We do not coat carpet directly. Koruser or Axiom carpet protection goes down first, then Peeltex over it. Fabrics and fresh paint get board or mats, and bare brick, untreated wood and other porous surfaces are not coated directly. Dock plates, elevator sills, door tracks and buttons can be coated, and polished marble and stone are approved. Historic or landmark finishes get a test patch if the conservator asks for one.
When does the crew work, and how do we start?
It starts with a site walk, where we look at the surfaces, the schedule and your contractor rules. We test a patch on a new surface, and we plan access and moving parts with the elevator contractor. Dated photo logs record the condition of each area.
Put one crew on your building
Walk the route with us, from the dock to the suite door. We will tell you what we protect, what gets different handling and how the plan would run.