Temporary Surface Protection for Precast Concrete
Spray it in your shop. We handle the field. Your crew applies Peeltex High Humidity supplied through Strata Shield Supply, and First Layer handles field touch-up and removal.
For precast manufacturers and erectors. Temporary surface protection only.
Finished precast, protected from the yard to the building
Finished precast faces take damage in the yard, on the truck and on the building. Temporary surface protection keeps the finish clean through each of those stops, and it peels off when the work is done.
Concrete, including precast, takes Peeltex High Humidity. Run a moisture test on the concrete first. High Humidity is the exterior product, good for about 12 months.
Three stops, one protection plan
In the yard
Finished precast faces, cast-in windows and embedded metal, protected while the pieces are stored.
On the truck
Finished precast faces, cast-in windows and embedded metal are protected on the truck too.
On the building
Field touch-up where the film is damaged during erection, and removal when the facade is done.
Peeltex High Humidity supply, plus field touch-up and removal
Peeltex is supplied to trades and fabricators through Strata Shield Supply, with crew training. First Layer picks up where your crew stops: touch-up on site and removal at turnover.
In your shop
Your crew applies the product, supplied through Strata Shield Supply, with crew training.
In the field
We handle touch-up on site, and removal at turnover.
Moisture test first
Run a moisture test on the concrete before Peeltex High Humidity goes on.
Removal planned up front
High Humidity is about 12 months outdoors, so removal is planned inside that window.
Five steps, one crew, one point of contact
For jobs where First Layer handles the field, the five steps run the same way. Removal timing is written into the job. See how it works.
Site walk
We walk the job with you, confirm what gets protected and agree the removal date.
Test patch on a new surface
Where a surface is new to us or delicate, we test first, before full application.
Install
We spray or build the protection, one crew on site.
Inspect and log
We inspect, repair and re-apply where needed, and keep dated photo records by area.
Peel and hand over
We peel, remove board, clean and leave the space punch-ready on the scheduled date.
Precast surface rules
These rules are in every quote. The moisture test comes before anything else.
What can be coated
- Concrete and precast, with Peeltex High Humidity after a moisture test.
- Exterior glass and frames, with Peeltex High Humidity, about 12 months outside.
- Metal, including embedded metal, with Peeltex High Humidity.
- Outdoor storage of finished pieces, with Peeltex High Humidity.
What is handled differently
- Run the moisture test on the concrete first.
- High Humidity is for exterior use. Renew after about 12 months.
- Bare brick, untreated wood and other porous surfaces are not coated directly.
- There is no published heat rating. Apply after any baking or curing.
Where it does not go directly: bare brick, untreated wood and other porous surfaces. See where it does not go.
Product only, or product plus field
Manufacturers can buy the product alone, or pair it with First Layer in the field. For product only, see Strata Shield Supply. For field work, request a quote or book a site walk.
Product only
Peeltex through Strata Shield Supply, with crew training.
Per job
Field touch-up and removal, quoted by square foot, linear foot or opening.
Annual plan
A set number of protection calls per year at a fixed rate.
Spray it in your shop
Your crew applies the product, and we handle the field.
Precast concrete protection, answered
Which Peeltex product goes on precast?
Peeltex High Humidity. It is the exterior product, and it can be used on concrete and precast after a moisture test.
Where do we buy the product?
Peeltex is supplied to trades and fabricators through Strata Shield Supply, with crew training.
Who handles the field work?
First Layer handles field touch-up and removal. Your crew sprays in your shop, and we handle the field.
How long does High Humidity stay on?
About 12 months outdoors. We plan removal inside that window and write the timing into the job.
Walk the yard or the building with us
Tell us what you cast and where it goes. We set the moisture test and the removal plan, and give you a quote for the field work.