Send us a text

By providing your phone number, you consent to receive calls and transactional/informational text messages (SMS) from First Layer, powered by Topline Pro, including calls and messages made using AI-powered technology. You can unsubscribe at any time by replying STOP. Message and data rates may apply. Message frequency varies.

By submitting this form, you agree to our Terms of Service & Privacy Policy.

Illustration of grey-coated steel beams stacked on a flatbed truck in the rain
For precast concrete manufacturers

Temporary Surface Protection for Precast Concrete

Spray it in your shop. We handle the field. Your crew applies Peeltex High Humidity supplied through Strata Shield Supply, and First Layer handles field touch-up and removal.

For precast manufacturers and erectors. Temporary surface protection only.

What we protect

Finished precast, protected from the yard to the building

Finished precast faces take damage in the yard, on the truck and on the building. Temporary surface protection keeps the finish clean through each of those stops, and it peels off when the work is done.

Concrete, including precast, takes Peeltex High Humidity. Run a moisture test on the concrete first. High Humidity is the exterior product, good for about 12 months.

Where it goes

Three stops, one protection plan

In the yard

Finished precast faces, cast-in windows and embedded metal, protected while the pieces are stored.

On the truck

Finished precast faces, cast-in windows and embedded metal are protected on the truck too.

On the building

Field touch-up where the film is damaged during erection, and removal when the facade is done.

The lead service

Peeltex High Humidity supply, plus field touch-up and removal

Peeltex is supplied to trades and fabricators through Strata Shield Supply, with crew training. First Layer picks up where your crew stops: touch-up on site and removal at turnover.

In your shop

Your crew applies the product, supplied through Strata Shield Supply, with crew training.

In the field

We handle touch-up on site, and removal at turnover.

Moisture test first

Run a moisture test on the concrete before Peeltex High Humidity goes on.

Removal planned up front

High Humidity is about 12 months outdoors, so removal is planned inside that window.

How a job runs

Five steps, one crew, one point of contact

For jobs where First Layer handles the field, the five steps run the same way. Removal timing is written into the job. See how it works.

  1. Site walk

    We walk the job with you, confirm what gets protected and agree the removal date.

  2. Test patch on a new surface

    Where a surface is new to us or delicate, we test first, before full application.

  3. Install

    We spray or build the protection, one crew on site.

  4. Inspect and log

    We inspect, repair and re-apply where needed, and keep dated photo records by area.

  5. Peel and hand over

    We peel, remove board, clean and leave the space punch-ready on the scheduled date.

Surface rules

Precast surface rules

These rules are in every quote. The moisture test comes before anything else.

What can be coated

  • Concrete and precast, with Peeltex High Humidity after a moisture test.
  • Exterior glass and frames, with Peeltex High Humidity, about 12 months outside.
  • Metal, including embedded metal, with Peeltex High Humidity.
  • Outdoor storage of finished pieces, with Peeltex High Humidity.

What is handled differently

  • Run the moisture test on the concrete first.
  • High Humidity is for exterior use. Renew after about 12 months.
  • Bare brick, untreated wood and other porous surfaces are not coated directly.
  • There is no published heat rating. Apply after any baking or curing.

Where it does not go directly: bare brick, untreated wood and other porous surfaces. See where it does not go.

Ways to buy

Product only, or product plus field

Manufacturers can buy the product alone, or pair it with First Layer in the field. For product only, see Strata Shield Supply. For field work, request a quote or book a site walk.

Product only

Peeltex through Strata Shield Supply, with crew training.

Per job

Field touch-up and removal, quoted by square foot, linear foot or opening.

Annual plan

A set number of protection calls per year at a fixed rate.

Spray it in your shop

Your crew applies the product, and we handle the field.

Questions

Precast concrete protection, answered

Which Peeltex product goes on precast?

Peeltex High Humidity. It is the exterior product, and it can be used on concrete and precast after a moisture test.

Where do we buy the product?

Peeltex is supplied to trades and fabricators through Strata Shield Supply, with crew training.

Who handles the field work?

First Layer handles field touch-up and removal. Your crew sprays in your shop, and we handle the field.

How long does High Humidity stay on?

About 12 months outdoors. We plan removal inside that window and write the timing into the job.

For precast concrete manufacturers

Walk the yard or the building with us

Tell us what you cast and where it goes. We set the moisture test and the removal plan, and give you a quote for the field work.