Send us a text

By providing your phone number, you consent to receive calls and transactional/informational text messages (SMS) from First Layer, powered by Topline Pro, including calls and messages made using AI-powered technology. You can unsubscribe at any time by replying STOP. Message and data rates may apply. Message frequency varies.

By submitting this form, you agree to our Terms of Service & Privacy Policy.

Illustration of a person in a respirator spraying grey protective coating on a building corridor floor
For general contractors and CMs

Temporary Surface Protection for General Contractors

First Layer protects installed finishes from install through turnover. One crew sprays, builds, maintains, documents and removes the protection, so finished work arrives at turnover clean.

For general contractors and construction managers in New York and the Northeast.

What we protect

Installed finishes, protected until turnover

Finished work gets damaged by the trades that follow it. First Layer puts temporary surface protection over installed finishes right after they go in, then peels it off at turnover. Spray-applied Peeltex covers the surfaces a spray can reach. Built protection covers the rest.

The package is written to match the Section 01 76 00 spec we prepared (Protecting Installed Construction), so protection is a line item with one sub and one person responsible, not a scatter of materials and crews.

Where it goes

Typical surfaces on a GC job

Floors

Finished hard floors take Peeltex Grey, with fine sand or glass dust broadcast into the wet coat about 1 hour after coating, for traction.

Glass and metal

Peeltex Clear on interior glass, mirrors and finished metal. Peeltex High Humidity on exterior windows, curtain wall and storefront frames.

Elevator cabs

Clear on buttons and operating panels, Grey or White on walls and floors. Sills and tracks can be coated too. See elevator cab protection.

Polished stone

Polished marble and stone are approved for Peeltex. See lobby and stone protection.

The lead service

One package, one sub, one person responsible

The combined protection package puts spray plus built protection on one line item. Behind it sit the services a GC needs once the protection is up.

Combined package

Spray plus built protection, written to Section 01 76 00.

Protection upkeep

A weekly or per-visit walk to inspect, repair and re-apply damaged protection, with a short report to the GC after each visit.

Condition and damage records

Dated before, during and after photo logs by area and trade, so the GC has backcharge evidence.

Turnover and removal

Peel, remove board, clean, and leave the space punch-ready on a scheduled date.

How a job runs

Five steps, one crew, one point of contact

The same five steps on every job. Removal timing is written into the job, so film is not left on past its rated life. See how it works.

  1. Site walk

    We walk the job with you, confirm what gets protected and agree the removal date.

  2. Test patch on a new surface

    Where a surface is new to us or delicate, we test first, before full application.

  3. Install

    We spray or build the protection, one crew on site.

  4. Inspect and log

    We inspect, repair and re-apply where needed, and keep dated photo records by area.

  5. Peel and hand over

    We peel, remove board, clean and leave the space punch-ready on the scheduled date.

Surface rules

What goes on, and what does not

These rules are in every quote. We confirm them against your finishes at the site walk.

What can be coated

  • Elevator sills and tracks, along with cab walls, floors, buttons and panels.
  • Polished marble and stone. A test patch only if the conservator asks for one.
  • Loading docks and steel plates. Forklift tears are easy to repair by re-coating.
  • Concrete, including precast, with Peeltex High Humidity after a moisture test.

What is handled differently

  • Carpet gets Koruser or Axiom carpet protection first, then Peeltex over it.
  • Bare brick, untreated wood and other porous surfaces are not coated directly.
  • Heavy forklift or equipment traffic can tear the film, so we flag tight turns at the walk.
  • There is no published heat rating. Apply after any baking or curing.

Where it does not go directly: bare brick, untreated wood and other porous surfaces. We use board, film or mats there. See where it does not go.

Ways to buy

Quoted per job, with other options

Request a quote or book a site walk and we quote from what we see. Compare the packages.

Per job

Quoted by square foot, linear foot or opening.

Annual plan

A set number of protection calls per year at a fixed rate.

Rental

Reusable door guards, corner guards and stair covers, installed and collected.

Product only

Peeltex through Strata Shield Supply, with crew training.

Questions

General contractor protection, answered

What does the combined protection package cover?

It puts spray plus built protection on one line item, from one sub, with one person responsible. It is written to match the Section 01 76 00 spec we prepared, Protecting Installed Construction.

How do you document the condition of finishes?

We keep dated before, during and after photo logs by area and trade. The GC gets backcharge evidence, and the owner gets proof that areas came back as they were found.

Who inspects the protection while other trades work?

We do. Protection upkeep is a weekly or per-visit walk to inspect, repair and re-apply damaged protection, with a short report to the GC after each visit.

When does the protection come off?

At turnover, on a scheduled date. We peel, remove board, clean and leave the space punch-ready. Removal timing is written into every job so film is not left on past its rated life.

For general contractors and CMs

Walk the job with us before the finishes go in

Tell us what is going in and what trades follow. We set the tests and the removal date, and give you a quote for the job.