Send us a text

By providing your phone number, you consent to receive calls and transactional/informational text messages (SMS) from First Layer, powered by Topline Pro, including calls and messages made using AI-powered technology. You can unsubscribe at any time by replying STOP. Message and data rates may apply. Message frequency varies.

By submitting this form, you agree to our Terms of Service & Privacy Policy.

Illustration of a gloved hand peeling protective film off a window frame
Facade Glass Package

Facade Glass Protection in New York

First Layer sprays temporary surface protection on new glass and frames after install, then peels it off at handover. It is the exterior grade, good for about 12 months.

For glazing contractors, window installers and restoration crews in New York and the Northeast.

The package

What is facade glass protection?

Facade glass protection is a peelable coating on new glass and frames that keeps the finish clean while other trades work around it. First Layer sprays Peeltex High Humidity, the exterior version of Peeltex, after the glass and frames are installed. It stays on through masonry washing, repointing and painting, and we peel it off at handover.

High Humidity is exterior only and runs about 12 months outdoors, so we confirm the service life for your project at the site walk and plan removal inside it. Bare brick, untreated wood and other porous surfaces are not coated directly. Concrete takes High Humidity after a moisture test. Where a surface is delicate, we test first. The package is quoted per job or per square foot of glass.

Where we use it

Four places it goes on the outside of a building

New windows

Glass and frames covered right after install, so they stay clean through every trade until handover.

Curtain wall

Glass and framing on the elevations still open to other trades, covered after install and peeled at handover.

Storefront frames

Street level frames and glass, covered from install to handover.

Architectural metal

Railings, canopies and panels stored or installed outdoors. See protection for fabricated parts.

Install to handover

One coating from the day the glass goes in

High Humidity is exterior and runs about 12 months. Remove it within the confirmed service life for your project. Exposure past that can make peeling harder, so we set the removal plan before the first coat goes on.

  1. Glass and frames go in

    New windows, curtain wall and storefront frames are installed. We walk the elevations and confirm what gets coated.

  2. Exterior grade protection goes on

    We spray the exterior grade over the glass and frames once they are in.

  3. Masonry washing

    The coating stays on while the masons wash the facade. Test your cleaner or acid first (see below).

  4. Repointing

    Glass and frames stay covered while the joints are redone.

  5. Painting

    The painters work around glass, frames and metal that are already protected.

  6. Handover

    We peel the coating off within the confirmed service life and hand over clean glass and frames.

Shop plus field

Spray it in your shop. We handle the field.

For glazing, curtain wall and steel fabricators. Peeltex is supplied to trades and fabricators through Strata Shield Supply, with crew training, and First Layer handles field touch-up and removal.

Precast manufacturers get the same split: Peeltex High Humidity supply, plus field touch-up and removal. See fabricated parts and precast protection.

In your shop

Your crew applies the product, supplied through Strata Shield Supply.

In the field

We handle touch-up on site, and removal at turnover.

Know before you specify

Test first

Two tests come before full application. Both run on a sample, so a problem shows up there and not on your facade.

Test against your cleaner

  • Test against the masonry cleaner or acid you plan to use.
  • Run it before full application, not after.
  • Tell us which product the masons will use at the site walk.

Test on sensitive finishes

  • Test on historic glass first.
  • Test on low-E coatings first.
  • Test on powder coated finishes first.

Where it does not go directly: bare brick, untreated wood and other porous surfaces. Concrete and precast take High Humidity after a moisture test. For masonry led jobs with a conservator involved, see historic restoration protection.

Questions

Facade glass protection, answered

How long does facade glass protection stay on?

Peeltex High Humidity is the exterior product, good for about 12 months outdoors. Plan to remove it within the confirmed service life for your project, because exposure past that can make peeling harder. We set the removal timing at the site walk and tie it to your handover schedule, so the coating comes off before that window closes.

Do you test before coating glass or frames in New York?

Yes. We test first on historic glass, low-E coatings and powder coated finishes, and against the masonry cleaner or acid your crew plans to use. Both tests happen before full application. For masonry led work with a conservator, read about our historic restoration protection.

Can the coating stay on during masonry washing, repointing and painting?

Yes, that is a main use. We apply High Humidity to glass and frames after install, and it stays on through masonry washing, repointing and painting until handover. Test your cleaner or acid first. The same coating also covers railings, canopies and panels, which we cover under fabricated parts protection.

How is the Facade Glass Package priced?

We quote it per job or per square foot of glass. Every quote covers material, labor, mobilization and a minimum job charge. The amount of glass, the number of elevations and the schedule shape the number. Book a site walk and we quote from what we see. You can compare it with the other First Layer packages.

Facade Glass Package

Walk the facade with us before the first coat

Tell us what is going in and what trades follow. We confirm the service life, set the tests and give you a quote for the job.